Thursday, June 21, 2012

Heat wave

Hello, I am reporting from what feels like the bowels of hell. Yesterday reached a high of 97F with a heat index of 105F. And today is predicted to hit the triple digits. That's too hot for anyone, but for someone with MS it can be debilitating. Any rise in body temperature, even 1 degree, can cause psuedo-flare ups and exacerbate existing symptoms. This has put quite the hitch in my plans for the week. I'm holding my own so far, though I notice that this afternoon I'm more woozy and unsteady than usual.

This week has been a whirlwind of doctor's appointments. Monday I got a lot done before my appointment. I was able to mow the front lawn, do some landscaping, and get some joint compound on the walls all before 10:30.
DSC_0415

The landscaping involved digging up the sod along the back fence line and mulching. I don't have edgers for the area yet but I plan on laying in stone edgers and planting along the fence line. The fence isn't ours and I find it very ugly. I want to plant something that will grow fairly tall and block most of it. We get a fair amount of shade back there, which limits my options.

DSC_0416

My main project for the week (and weeks ahead) is the upstairs. My husband and I did a walk-through and made some decisions so that we can move the project forward. There is an area for a bathroom upstairs with the plumbing for a toilet roughed in. We had been toying with the idea of putting a shower up there as well, but it ends up not being a feasible option. There really isn't the room for a decent size shower stall and more importantly, no way to get the plumbing in.
Right now this is how it all looks:

The hallway: I have a good sanding left and then to touch up a few spots.
DSC_0418

This is the closet area in the room. I'm going to finish the room in two sections starting with this area. The bathroom area is on the other side of the plastic. The closet on the right will have a hanging bar and the wall on the left will have built-in cabinets.
DSC_0420

This is the other end of the room. For now it will be the holding cell. Once the above area is done we can move a junction box, finish putting up the drywall, and get it all paint ready.

DSC_0421

I've also been playing around with my stash. I've uploaded more of it into Ravelry, and deciding what to keep and what to destash. I'm also picking projects for the keepers. I've got quite the case of startitis. I've also frogged a few projects, but more on that in tomorrow's report. After yet another doctor's appointment.

No comments: